A power outage at Singapore’s Woodlands Checkpoint at about noon on Wednesday stalled one of the world’s busiest land borders, sending tailbacks deep into Johor Bahru even though Malaysian immigration halls were running at full capacity.

Malaysia’s home ministry said the failure began on the Singapore side and left a long queue of cars and buses waiting to enter Malaysia. Additional lanes were opened at the Bangunan Sultan Iskandar complex and police deployed along Jalan Tebrau, Jalan Skudai and Jalan Lingkaran Dalam to manage workers returning from Singapore during the evening peak.

What travellers saw on the ground

By late evening, navigation apps quoted roughly 32 minutes to enter Johor Bahru from the checkpoint area and about 70 minutes for the reverse trip into Singapore, according to Malaysian officials quoted in local media. A lorry heading toward Singapore that suffered a mechanical breakdown compounded the jam, narrowing usable roadway as congestion built from the noon incident.

Singapore’s Immigration and Checkpoints Authority told motorists to expect delays at Woodlands and noted that two vehicles had broken down near the international boundary on the Causeway toward Singapore, blocking one of three lanes. ICA had already warned that Deepavali long-weekend traffic from 6 to 9 November could stretch waits, citing record crossings during the September school holidays and tighter security checks in place since February.

Cross-border knock-on effects

The Causeway carries tens of thousands of commuters daily—Malaysians who live in Johor and work in Singapore, shoppers, and weekend travellers. When Singapore-side systems falter, Malaysia’s side can clear passengers quickly yet still absorb a wall of metal because vehicles cannot leave the narrow link until both jurisdictions process them.

Authorities on both sides did not immediately specify the root cause of the blackout in public statements reviewed Wednesday night. ICA’s social posts focused on live delays rather than engineering details, leaving employers and bus operators to reroute staff toward the Tuas Second Link where capacity allowed.

What happens before the holiday rush

With Deepavali travel starting in days, the outage is a reminder that Woodlands remains under redevelopment and that ICA has been running prolonged construction and APCS rollout works at Tuas. Commuters who cannot shift to the Second Link have little alternative: the Causeway is a single choke point, and a few hours without stable power can translate into lost shifts, missed flights connected by bus, and perishable goods stuck in idling trucks.

Singapore and Malaysia have no joint real-time dashboard for border power failures; tonight’s recovery timeline will determine whether Thursday’s morning peak starts clean or inherits another backlog.

Employers on both sides of the strait said they were tracking staff arrival times manually Wednesday, with some factories in Johor granting grace periods for night-shift workers stuck on the link. Bus operators that run express services between Larkin and Queen Street reported doubled journey times, prompting cancellations on later rotations.