A partially built three-storey building collapsed in Gali Sattara in Sheesh Mahal, steps from Chawri Bazaar in Old Delhi, on Thursday morning, killing at least two construction workers and leaving several others feared trapped under concrete slabs and steel rods. Delhi Fire Services said the first emergency call arrived at 9:50 a.m., by which time neighbors had already pulled four people from the debris and rushed them to hospital.

Rescue operations in dense lanes

Central district police said roughly fifteen workers were on site when the structure failed. Six to seven had been accounted for by midmorning, including four who escaped without serious injury. Three were extracted by firefighters; two were declared dead at the scene and a third survived with injuries that doctors described as not life-threatening, according to The Hindu’s reporting from the lane.

At least six fire units, water tenders and specialized rescue vehicles squeezed into the alleyways around the collapse, where overhead wiring and adjoining shops complicate heavy equipment access. Deputy Commissioner of Police (Central) Rohit Rajbir Singh told reporters that teams were mapping voids in the rubble before lifting slabs, a slower process meant to avoid further casualties among trapped workers.

Construction oversight questions

The building was still under construction when it failed, raising immediate questions about structural design, load-bearing walls and whether municipal agencies had cleared each stage of work. Old Delhi’s mix of century-old masonry and informal vertical additions has been the site of repeated safety campaigns, yet narrow plots and rapid retrofitting continue to strain enforcement capacity.

Thursday’s collapse is distinct from earlier slab failures in other parts of the capital, but municipal officials said the 50-square-metre plot had no sanctioned plan and had not been booked for unauthorized construction. Preliminary findings cited in NDTV and Mint indicate workers were stripping shoring from a roof cast about two weeks earlier when non-engineered material that had not fully cured gave way; Chief Minister Rekha Gupta suspended the ward’s junior and assistant engineers and ordered an FIR against the contractor.

What happens next

Hospitals treating the injured will document trauma patterns that forensic teams may later match to specific floors, while the fire service maintains a round-the-clock search until commanders declare the site cleared. Families of missing workers gathered at police barricades, waiting for officials to publish a verified list of names rather than relying on social media rumors that often spread faster than district control rooms can confirm.

Metro services on the nearby Chawri Bazaar corridor continued with minor crowd-control adjustments at exits, though commuters reported lane closures and dust hanging over the market district. Shopkeepers said they fear a broader sealing order if engineers find that neighboring walls shifted during the collapse. For now, the priority remains life detection in the rubble; accountability hearings, compensation claims and possible criminal charges will follow once rescue commanders stand down.